top of page
Concrete Wall

SERVICES

All of East Texas Onsite Insights designs meet current standards set forth in Chapter 285 of the Texas Administrative Code.  

 1.  Site and Soil Evaluations

The site evaluation is used to initially determine what system best suits your site based upon soil conditions and other physcial features of your property, such as lakes, creeks, and wells. 

​

2.  Residential and Commercial Site Consultation

We come to your site to discuss the layout and suitablity of your project.

​

3.  Design Site Specific Septic Systems​

A scaled computer generated design will be provided that will show the property dimenisions, structures, tank location and the disposal area needed for your specific site.  Different  treatment tanks and disposal means such as aerobic system with surface application or drip disposal will be used to accomodate your specific needs.

​

4.  Subdivision Reviews and Development Plans

A comprehensive study and septic system planning for new residential subdivisions before final approval of county officials. In certain situations for commercial developments such as RV Parks or mobile home parks, a development plan may be required in addition to the septic plans.  Also, if a property is divided a subdivision review may be required by your individual county.  We provide the necessary documents for these situations.

​

5.  Flood Zone Determination  

We determine if your property is located in a FEMA 100 year flood zone.

915 Bergstrom Place

Marshall, Texas 75672

Email: jameshester2020@gmail.com

Tel: 903-930-0974

SOCIALS

  • Facebook
  • LinkedIn

© 2022 by ETOI.
Proudly created with Wix.com

bottom of page